Pile Cut Off Level Drawing. Step 1 predrilling (超前鑽) carry out predrilling at the centre of each bored pile location. The safe load on the pile shall be the least of the following:

Structural Foundations Pile Cut off Levels Autodesk
Structural Foundations Pile Cut off Levels Autodesk from forums.autodesk.com

However, present procedures for design vary considerably among agencies and in some cases do not reflect the best available information. This will help avoid any clashes with column base plates, holding down bolts and the pile cap reinforcement. Concrete in pile bore is simultaneously achieved by suitable method.

Structural Foundations Pile Cut off Levels Autodesk

For timber piles of length less than 14 meters, the diameter of the tip should be greater than 150 mm. • pile group effects could also govern the settlement of working piles • specific requirements of the structure could influence the total tolerable settlement and differential settlements • permitted positional and verticality tolerance of a single bored pile or bored pile group with a. B) final load at which the total displacement corresponds to 5 mm. The safe load on the pile shall be the least of the following: